/ 
  
  
    
      1
    
      2
    
      3
    
      4
    
      5
    
      6
    
      7
    
  
  
    
      ·
    
      ·
    
      ·
    
      ·
    
      ·
    
      ·
    
      ·
    
  
  Shelly Bradbury and Ron Magers
LOCATION:  Endicott College - Beverly, MA
SITE:  Main Campus
COMMISSION:  Create a new foot bridge 40 feet long
DESIGN SOLUTION:  Used surrounding natural elements for inspiration to maintain the peaceful beauty on campus.
CHALLENGE:  Designing around the parameters of the building codes for a bridge
to pass inspection.
MATERIALS:  Panels were 1/4" Stainless Steel and powder coated.  LEDs used to
illuminate bridge.
CONTRACTORS:  Griffin Engineering Group, Salem Metal, Powder Pro, Magers Product, W.D. Bairstow Co.-Mechanical.